The main building at Campus No. 805 opened in 1952 and was home to the original S.R. Butler High School. The facility was later re-purposed as Roy L. Stone Middle School before eventually being decommissioned by the Huntsville city school system in 2009. The property was sold in 2014 to a private developer and in conjunction with the redevelopment, the city of Huntsville purchased four acres of the nearly thirteen-acre site for green space, parking, and a large performance lawn in the heart of the campus. Serving as a catalyst for urban renewal in west Huntsville, the mixed used development is currently home to two major craft breweries – Yellowhammer Brewery and Straight to Ale – along with Bubba’s Silver Spoon Catering, Lone Goose Saloon, and a wide range of restaurants, retail shops, and special event venues.

Project Location

Huntsville, Alabama

Consultants

Mullins LLC
PEC Structural Engineering, Inc.
SSOE Group

General Contractor

J T Schrimsher Construction Company